Nipawin held its first village election on June 2, 1925. On May 1, 1937, Nipawin formally received town status.
Our Conference Centre Meeting Space, a Perfect Place to Host Functions and Events
Nipawin held its first village election on June 2, 1925. On May 1, 1937, Nipawin formally received town status.
Our Conference Centre Meeting Space, a Perfect Place to Host Functions and Events
Home » Community Services » Moving Permit
A Moving Permit is required when relocating a building or structure from one property to another — whether it’s within Nipawin, to Nipawin, or out of Nipawin. This includes homes, garages, sheds, modular units, and other large structures — even if they’re temporary or mobile.
A Moving Permit is also required for sea containers that are intended to be used as a building.
The permit ensures that the move is conducted safely, meets zoning requirements, and complies with local road usage rules and site regulations.
You must apply for a Moving Permit before:
Relocating any residential or commercial building
Moving a mobile or modular home
Bringing in or removing a large accessory building (like a detached garage or workshop)
Using a sea container as a building (whether it’s new or already in use)
Not sure if your project qualifies? Reach out to the Planning & Development team! Better safe than sorry.
Go to the Online Application Form
Start the application here
Choose Permit Type
Select “Moving” from the dropdown list.
Enter Contact Information
Include both the applicant and the property owner’s details.
Provide Property Details
Current location of the structure
Destination property (with address and legal description if possible)
Any route plans or transport details
Upload Supporting Documents
These often include:
Site plan for the new location
Photos of the building
Transportation route map
Engineering reports (if applicable)
Submit Your Application
You’ll receive a follow-up from Town staff if additional details are needed.
Be prepared to upload:
A site plan showing where the structure will sit
Recent photos of the building
Transport route plan
Engineering report (if required for older or damaged structures)
210 Second Avenue East
Box 2134, Nipawin, SK
S0E 1E0
Monday – Friday
8:30 am to 4:00pm